The HotKit Hot Water Installation Kit brings together every core valve and fitting needed for a compliant storage hot water connection in one box, cutting installation time without cutting corners on compliance.
Every component is lead-free and WaterMark approved, certified to AS4032.2, AS1357, AS3688 and WMTS 012. An insulated PU cover is supplied in accordance with AS3500.4 to reduce heat loss, and the kit suits both horizontal and vertical installations.
Features
- Lead-free, WaterMark approved components throughout, for regulatory compliance
- 15mm tempering valve for temperature control, certified to AS4032.2
- Dual isolation non-return ball valve with check valve for safe, serviceable back-flow protection
- Insulated PU cover supplied in accordance with AS3500.4
- Suits horizontal or vertical installation
- Rated working temperature 1°C to 90°C, maximum pressure 1400kPa
Technical Specifications
| Parameter | Specification |
|---|---|
| Temperature range | 1°C – 90°C |
| Maximum operating pressure | 1400kPa |
| Material | Lead-free brass & copper |
| Insulation | PU cover (included) |
| Installation orientation | Horizontal or vertical |
| Copper tubes | Not included |
Kit Components
- Swivel tee – 15FI x 15FI x 15C x 15C (lead-free)
- 2 × copper compression unions – 15MI x 15C (lead-free)
- 2 × copper compression elbows – reducing extended 20MI x 15C (lead-free)
- PU cover to suit the dual isolation non-return assembly
- Hexagonal plug – 15mm BSP (lead-free)
- Tempering valve – 15mm (lead-free)
- Dual isolation non-return ball valve with check valve – 15mm, copper compression (lead-free)
Applications
Suited to storage hot water systems in domestic and commercial settings where reliable inlet control, back-flow prevention, insulation and fast, tidy installation are required.
Installation Notes
- Ensure the mounting area is clean, dry and accessible before installation.
- Retain the insulation cover until final plumbing connections are complete.
- Set the tempering valve to local code requirements and confirm the check/isolation assembly is installed in the correct orientation.
- After installation, pressurise the system and check for leaks before cladding the insulation.
- Observe current regulatory requirements for hot water system installations, including safe access for maintenance and servicing.